Ready to play
Ready to play
The development of the Wadi Kert bridge construction project in the Nador region is progressing through its final stages, with the aim of expanding and improving National Road 16 to ensure safe and efficient transportation for heavy trucks associated with the Nador port. The engineering works involve rerouting the road, with the construction of columns ranging between 16 and 27 meters in height, to strengthen the infrastructure and support heavy loads. Nador Port, located 30 kilometers west of the city, is a strategic port targeted to handle millions of containers annually. It has enormous capacity for goods and materials and is part of a traffic network designed to boost economic development in the eastern region and improve the flow of trucks toward the port and its linked industrial zone.
Notice: This Is an AI-Generated Summary
Comments (0)