7 Hrs
Source:
ناظورسيتي
Source: ناظورسيتي
7 Hrsناظورسيتي
Source: ناظورسيتي
7 HrsReady to play
Ready to play
The rail link project to Nador West Med Port includes the construction of three bridges, the longest of which will be about 1,250 metres, as part of Lot 4 of Phase Two. The project also includes a single-track line of approximately 52 kilometres from Selouane to the port, with an operating speed of up to 160 kilometres per hour, and a rail marshalling yard inside the port. Its total cost is estimated at around 4.3 billion dirhams. The project aims to connect the port to the national rail network and boost freight transport.
Notice: This Is an AI-Generated Summary
Comments (0)