ناظورسيتي
ناظورسيتي
Ready to play
Ready to play
The technical proposal for the 116-kilometre railway line between Nador and Oujda via Berkane includes a 6.52-kilometre twin-bore tunnel and around 30 kilometres of viaducts and other engineering structures, including a structure nearly 500 metres long to cross the Moulouya River. The main corridor is estimated to cost around 14.935 billion dirhams, rising to 18.628 billion with the addition of the 26-kilometre Berkane–Saïdia link. The line is proposed as double-track and electrified, with speeds of up to 160 kilometres per hour for passenger trains and 80 for freight. These are preliminary figures; no official announcement has yet been made about funding or when work will begin.
Notice: This Is an AI-Generated Summary
Comments (0)