147 Days
Source:
برلمان.كوم
برلمان.كوم
Ready to play
Ready to play
During the year 2024, the Am El Rabeh Water Basin Agency carried out a program for the maintenance of water facilities and the inspection of dams, with a total cost of 23.07 million dirhams. The goal was to ensure the safety of hydraulic structures and preserve their operational capabilities for the long term.
Notice: This Is an AI-Generated Summary
Comments (0)