ناظورسيتي
ناظورسيتي
Ready to play
Ready to play
Rehabilitation and road improvement projects in Nador have faced criticism and concern from residents and local stakeholders due to non-compliance with technical standards, particularly regarding stormwater drainage. It was observed that the design of the catch basins and water flow pathways under the asphalt was not properly considered, which threatens to repeat water pooling issues during the rainy season. This could lead to clogged networks and flooding, potentially disrupting traffic and causing financial damage to infrastructure. Residents and local entities are calling for an on-site investigation and the proposal of corrective measures to ensure that rehabilitation projects adhere to technical specifications and safeguard public safety.
Notice: This Is an AI-Generated Summary
Comments (0)