شبكة راية الإعلامية
شبكة راية الإعلامية
Ready to play
Ready to play
The Palestinian Land Authority, based on presidential directives, allocated two plots of land in favor of the Energy Authority and the Palestinian Electricity Transmission Company in Nablus, aimed at establishing two electricity transformer stations to enhance the energy infrastructure and improve the quality of services for citizens. The allocation includes an area of 25,000 square meters in Talouza and 20,000 square meters in Asira Ash-Shamaliya, contributing to increasing the efficiency and stability of the electricity network and supporting energy security in Palestine. This step is part of the government's efforts to develop the national infrastructure and achieve sustainable development.
Notice: This Is an AI-Generated Summary
Comments (0)