Ready to play
Ready to play
The Ministry of Water and Irrigation and the Water Authority have uncovered five violations on a 300mm water transmission line in the Naour area. These included illegal filling of tankers and supplying farms and homes without authorization. The violations have been removed and the line repaired, with investigations ongoing and measures being taken against the violators. This is part of joint efforts to monitor water sources and reduce unauthorized access and attacks on water infrastructure in the Kingdom.
Notice: This Is an AI-Generated Summary
Comments (0)