16 Hrs
Source:
فلسطين اليوم
فلسطين اليوم
Ready to play
Ready to play
Engineer Mazen Al-Araishi, Director General of Engineering and Maintenance at the Ministry of Health, stated that 44 out of 116 generators are still operational, while 68 generators have gone out of service due to a crisis with the electrical generators.
Notice: This Is an AI-Generated Summary
Comments (0)