18 Hrs
Source:
وكالة الأنباء القطرية
وكالة الأنباء القطرية
Ready to play
Ready to play
The Public Works Authority "Ashghal" continues the third phase of the "Flood Prevention" program in North Doha, aimed at reducing rainwater accumulations and strengthening the readiness of drainage networks at approximately 51 sites across multiple areas. This is being achieved through the construction of 50 kilometers of drainage networks and new pumping stations. The project seeks to improve infrastructure and maintain smooth traffic flow during the rainy season, utilizing locally sourced materials and manufacturers at a rate of up to 85%.
Notice: This Is an AI-Generated Summary
Comments (0)