وكالة الأنباء القطرية
وكالة الأنباء القطرية
Ready to play
Ready to play
The Public Works Authority, "Ashghal," announced the commencement of the first phase of the Road and Infrastructure Development Project in Azghawa and Thumied, with a cost of approximately 688 million Riyals. The project aims to improve the road network and logistical services in the two areas. It includes the construction of a 27-kilometer road network, as well as 50 kilometers of pedestrian and bicycle paths, and the provision of over 3,800 parking spaces. Additionally, the project entails stormwater drainage and sewage networks, advanced infrastructure services, covering an area of about 2.7 million square meters. The initiative seeks to support population growth, enhance service quality, and minimize the impact of construction activities in the region. It is located in the northwestern part of Doha.
Notice: This Is an AI-Generated Summary
Comments (0)