Ready to play
Ready to play
The Al-Khafji Municipality continues to implement developmental projects to improve the road network and infrastructure. These include the development of Mecca Street, which spans 3,500 meters to enhance traffic safety; the completion of rainwater drainage works in Al-Khozama neighborhood through the construction of a 500-meter network; and the Jowhara Intersection project, aimed at improving traffic flow and connecting local neighborhoods by creating a roundabout with a diameter of 76 meters and developing the roads leading to it. The project has currently achieved approximately 30% completion.
Notice: This Is an AI-Generated Summary
Comments (0)