صحيفة مكة
صحيفة مكة
Ready to play
Ready to play
The seawater cooling project in Jazan aims to equip industrial facilities with the necessary cooling water for their operations, enhancing the sustainability of the sector and supporting industrial expansion in line with Saudi Arabia’s Vision 2030. The project has achieved 98.33% completion and includes the construction of two pipelines, each 3.25 kilometers long, as well as a main station with a capacity of up to 160,000 cubic meters per hour. It also features a system of pumps and all treatment systems to ensure water quality and continuous service. The project contributes to improving the efficiency and capacity of operational processes in the city's industrial facilities.
Notice: This Is an AI-Generated Summary
Comments (0)