Ready to play
Ready to play
The article discusses the Rainwater Drainage Network Project in Samta Governorate, which has achieved 55% of its total work, with a value of 4.7 million Riyals. The project aims to address eight critical points through four main routes to enhance infrastructure efficiency, reduce water pooling, improve traffic safety, beautify the urban landscape, and raise the quality of life. Implementation includes constructing a drainage network spanning 3,690 meters of UPVC pipes of various diameters, along with installing 52 rain catch basins and 20 manholes. The first section has been completed in full, covering 1,650 meters, while work is ongoing on the second section. The final phase involves executing the third and fourth sections, with a total length of 1,190 meters, connecting different areas to an integrated drainage system, with the aim of reducing water accumulation in the more densely populated neighborhoods within the governorate.
Notice: This Is an AI-Generated Summary
Comments (0)