Ready to play
Ready to play
The Royal Commission for Riyadh City announced that over 50% of the Thumama Road Bridge project at the Al Olaya Road intersection has been completed. The project aims to improve the efficiency of the road network and enhance traffic flow in the capital by constructing concrete foundations and installing the structural framework of the bridge. The bridge is designed with three lanes in each direction, increasing its capacity to approximately 200,000 vehicles per day, to accommodate the growing traffic needs in Riyadh. This initiative is part of the Road Network Development Program, which seeks to create a sustainable urban transportation system aligned with urban expansion and to improve quality of life.
Notice: This Is an AI-Generated Summary
Comments (0)