Ready to play
Ready to play
Saudi Energy Company and Expo 2030 Riyadh plan to implement a project to deliver electrical power supplies to the exhibition site. This is part of preparing the location according to the highest standards of quality and reliability before the event begins in October 2030. The agreement includes developing the main electrical infrastructure, which involves constructing a central power station and three transformation stations, and connecting them to the transmission and distribution network. This aims to ensure the site's readiness to host approximately 197 countries and 42 million visitors. The national collaboration on this project reflects Saudi capabilities and seeks to guarantee operational continuity, delivering an exceptional exhibition that meets all operational and technical requirements on schedule.
Notice: This Is an AI-Generated Summary
Comments (0)