Ready to play
Ready to play
The development project for the King Abdullah Road intersection with Riyadh Road west of Al-Hofuf in Al-Ahsa was completed six months ahead of schedule, while maintaining quality and safety through flexible management and meticulous planning. The new tunnel, which is 1,500 meters long, accommodates three lanes in each direction, and includes water drainage systems, energy-efficient lighting, and traffic safety features such as emergency stairs and concrete barriers. The goal was to reduce traffic congestion and improve flow at one of Al-Ahsa's main entrances, with an assessment of its impact on travel time after operation.
Notice: This Is an AI-Generated Summary
Comments (0)