الوطن
الوطن
Ready to play
Ready to play
The article focused on the importance of repairing hidden leaks in drinking water systems to help reduce waste and improve the efficiency of water resource utilization in Saudi Arabia. The Saudi Water Authority stipulates conditions for the possibility of reviewing high bills resulting from such leaks, including repairing defects within 30 days of the bill issuance, attaching repair invoices and photos of the defects, and having no prior violations. It also indicates that the beneficiary can request a bill review within two months of receiving the bill, provided certain conditions are met, in exchange for settling 50% of the amount, with the leak repair must be completed within 30 days. The Authority emphasizes that early detection and repair reduce water loss and enable consumers to benefit from the regulatory mechanism for reducing high bills.
Notice: This Is an AI-Generated Summary
Comments (0)