Ready to play
Ready to play
The Chairman of the Saudi Water Authority, Engineer Abdullah Al-Abdulkareem, inspected the water service development projects in the Jazan region during his visit. These projects include 35 initiatives with a total value exceeding 3 billion riyals, aimed at improving water supply and quality. The region faces geographical challenges that require the establishment of filling stations and network upgrades to ensure continuous supply. Notable improvements have been achieved following repair works and treatment processes. These efforts are part of the sector's strategy to maintain water continuity and enhance its reliability, in alignment with Saudi Vision 2030.
Notice: This Is an AI-Generated Summary
Comments (0)