18 Hrs_1777292798912_197359786.jpg&w=48&q=75)
Source:
عكس السير
عكس السير
Ready to play
Ready to play
Damascus Governorate confirmed that the rockfall from Jabal Qasioun onto the Khorshid area is not directly related to the ongoing excavation works along Qasioun Avenue. It clarified that the fallen rock was loose and prone to sliding, a well-known geological phenomenon in the mountain. The governorate also indicated that safety measures have been taken, including a 960-meter-long metal fencing. The local teams are monitoring the area to identify any other hazards and are studying temporary protective measures until permanent engineering solutions can be implemented to prevent future incidents.
Notice: This Is an AI-Generated Summary
Comments (0)