صحيفة العروبة
Source: صحيفة العروبة
161 Daysصحيفة العروبة
Source: صحيفة العروبة
161 DaysReady to play
Ready to play
The Syrian Emergency and Disaster Management Teams have reinforced the damaged part of Al-Asharah Bridge in Deir ez-Zor using additional quantities of debris, following the rise in the water level of the Euphrates River. This measure was taken to prevent further damage and to ensure the safety of traffic flow. The local committee also reported an immediate evacuation of Houijeh Sakar and Houijeh Kataa, emphasizing the need for residents' cooperation to safeguard everyone’s safety. This comes as part of an urgent response to the consequences of the Euphrates River flooding and the ministry’s readiness to handle the increasing water levels in the area.
Notice: This Is an AI-Generated Summary
Comments (0)