152 Days
Source:
صحيفة العروبة
Source: صحيفة العروبة
152 Daysصحيفة العروبة
Source: صحيفة العروبة
152 DaysReady to play
Ready to play
The teams from the Ministry of Emergency and Disaster Management continue to carry out efforts to remove the earthen barricades along the banks of the Euphrates River in the Keshma area of eastern Deir ez-Zor countryside, aiming to protect residents and property from rising water levels. Authorities confirmed that the river level remains stable at 3 meters, with a horizontal expansion of approximately 50 meters, and expect the gradual receding of the flood to begin this evening.
Notice: This Is an AI-Generated Summary
Comments (0)