صحيفة العروبة
Smart Reader
Ready to play
Smart Reader
Ready to play
Source: صحيفة العروبة
150 Daysصحيفة العروبة
Ready to play
Ready to play
Source: صحيفة العروبة
150 DaysThe Ministry of Public Works and Housing announced the completion of the first phase of reinforcing Al-Asharah Bridge in Deir ez-Zor, aimed at enhancing its stability and ensuring the continuity of transportation between both banks of the Euphrates River after recent water level rises. This was preceded by technical team operations in collaboration with the Syrian Construction and Building Corporation to protect the bridge that connects the Al-Jazeera and Al-Shamiyah areas, which is considered a vital artery in the region. The ministry is preparing to rehabilitate the Political and Martyrs Bridges next week to strengthen connectivity, improve infrastructure, and support economic and social activity in the governorate.
Notice: This Is an AI-Generated Summary
Comments (0)