12 Hrs
Source:
الجمهوريّة
الجمهوريّة
Ready to play
Ready to play
The regional Directorate of Equipment and Housing in Gafsa has finalized a project to upgrade Local Road 899, which connects the districts of Gafsa North and Sinder, at a cost of approximately 59 million dinars. The project involves upgrading the road over a length of 29 kilometers, including the installation of water facilities and gravel coating. It is expected to be completed within 24 months, with the aim of alleviating the isolation of local residents and connecting them to neighboring administrative centers.
Notice: This Is an AI-Generated Summary
Comments (0)