الشروق التونسية
الشروق التونسية
Ready to play
Ready to play
The Malouk Dam spillgate in Kairouan State was reopened after repairs, following a technical malfunction that occurred between June 17 and 18, 2026. This malfunction led to a large volume of water being released and an increase in the water level of the valley. Technical teams coordinated to ensure operational readiness, and the gate resumed normal operation with restored functions and safety conditions. There was a plan to drain approximately 100,000 cubic meters of water to irrigate agricultural areas in Jendouba State, but the malfunction caused additional water to flow toward neighboring regions. The excess water was directed into the Madjera Valley and Sidi Salem Dam.
Notice: This Is an AI-Generated Summary
Comments (0)