Ready to play
Ready to play
Today, an electric generator was installed at the disinfection plant on Assad Ben Al-Furat Street in Hammamet, as part of efforts to ensure the continuous operation of disinfection services, especially during power outages. This was carried out in coordination between the National Sanitation Office and local authorities. The purpose of this step is to guarantee the plant's uninterrupted operation, reduce disruptions that could affect the sanitation system, and ensure the quality of services provided to citizens.
Notice: This Is an AI-Generated Summary
Comments (0)