تونزي تيليغراف
Source: تونزي تيليغراف
1 Dayتونزي تيليغراف
Source: تونزي تيليغراف
1 DayReady to play
Ready to play
On Sunday night, Tunisia witnessed the transportation of a large electricity generator from the Port of Menzel Bourguiba in Bizerte Governorate to the electricity production station in Mornag. The move aims to strengthen the national electricity system, which faces significant pressure during the summer season. The generator was transported using specialized equipment and a carefully chosen route, due to its large size and the requirements of its transfer. It is noteworthy that the generator was manufactured in Germany and is part of efforts to enhance the country’s electricity production capabilities. Installation and technical testing are expected to take about a month before it is officially put into operation. There are ongoing questions regarding its actual capacity and its potential impact on improving the electricity network’s performance and reducing outages caused by high demand and extreme heat.
Notice: This Is an AI-Generated Summary
Comments (0)