Ready to play
Ready to play
The General Directorate of Dams and Major Hydraulic Works confirmed that the Douimis Dam project in Bizerte Governorate will be operational before the end of 2026. This project will allow the storage of approximately 45 million cubic meters of water and its transfer to Skanen Dam through the northern water transfer system, with the aim of supporting drinking water supply and irrigating the targeted areas. During the field visit, the importance of intensifying construction work and respecting deadlines was emphasized, along with a focus on completing the final stages of installation and reinforcement to ensure quality and safety. The plan is also to swiftly address some technical shortcomings to guarantee the operation of the water pumping station towards Skanen Dam as soon as possible.
Notice: This Is an AI-Generated Summary
Comments (0)