الصباح
الصباح
Ready to play
Ready to play
The high-voltage electricity transformation station (33/225 kV) was inaugurated in Hashad area in Bou Argoub, Nabeul Governorate, aimed at strengthening the power transmission network and connecting it with Bizerte, Grombalia, and Jbel Rassas stations. The total cost amounted to approximately 47 million dinars and includes the installation of two transformers, connection and measurement cells, and long overhead lines exceeding 24 kilometers, with the goal of improving energy distribution and reducing outages. The ceremony was attended by local officials and a team from the Tunisian Electricity and Gas Company, supporting the development of electrical infrastructure in the region.
Notice: This Is an AI-Generated Summary
Comments (0)