Ready to play
Ready to play
The connection and diversion work of a 500 mm diameter water pipe will be carried out on Regional Road 27 between Manzemim and Kelibia. This may cause disruptions and interruptions in drinking water supplies to the municipalities of Kelibia, Manzemim, and Hammam Ghezaz starting from September 22 at 6:00 AM. Water supply is expected to gradually resume after the completion of the work, beginning on September 23 at 6:00 PM. The measures focus on improving infrastructure to double the road and enhance water supplies, while residents are advised to make the necessary preparations during the outage period.
Notice: This Is an AI-Generated Summary
Comments (0)