22 Hrs
Source:
الجمهوريّة
الجمهوريّة
Ready to play
Ready to play
The Tunisian Ministry of Equipment and Housing announced the closure of Local Road No. 457, connecting Tunis and Mghira at the Saint-Gobain Bridge, on September 20 and 21, 2026, from 10 PM to 4 AM, due to construction works as part of the southern entrance expansion project for the capital. Drivers passing through the city center will be allowed to take alternative routes such as Avenue Moncef Bey, Bab Alioua Bridge, National Road No. 1, as well as Saint-Gobain Bridge towards Mghira, with a reminder to adhere to traffic signals.
Notice: This Is an AI-Generated Summary
Comments (0)