Ready to play
Ready to play
Baja Governorate experienced heavy rainfall on Friday evening, with recorded amounts ranging from 9 to 30 millimeters. This caused damage to the infrastructure of roads, especially those still under construction, as well as main streets such as Habib Bourguiba Street. These rains prompted intensive interventions by civil protection teams and disaster response committees, who worked to drain water, remove fallen trees from the roads, clear blocked streets, and facilitate traffic flow. Measures were also taken to manage rainwater in residential areas and healthcare facilities. Limited damage was reported on some roads and bridges. Emphasis remains on continuing repairs and intervention efforts to minimize the impact of future rains.
Notice: This Is an AI-Generated Summary
Comments (0)