22 Hrs
Source:
الشروق التونسية
الشروق التونسية
Ready to play
Ready to play
Libya resumed oil pumping today through the Sharara-Zawiya pipeline after it was shut down due to an issue with valve number 7. The closure resulted in a loss of approximately 130,000 barrels per day over four days, leading to financial losses exceeding $75 million. This crisis caused a significant decrease in production at one of Libya's largest oil fields, with warnings of further losses if the flow remains halted.
Notice: This Is an AI-Generated Summary
Comments (0)