1 Day
Source:
الصباح
الصباح
Ready to play
Ready to play
Work to upgrade and pave Local Road No. 650, linking southern Kairouan with Chebika, is 80% complete along its 19.2-kilometre stretch. Around 13 kilometres have been paved with asphalt concrete, and rainwater drainage channels and sidewalks have been completed in several areas. The project, which also includes Local Road No. 804, costs approximately 49 million dinars and aims to improve connections between the delegations and make travel between National Roads No. 2 and 3 easier.
Notice: This Is an AI-Generated Summary
Comments (0)