Ready to play
Ready to play
A project is currently underway to connect the Sidi Bouzid Governorate to natural gas via a 125-kilometer pipeline that links the towns of Hajeb El Ayoun, Jemla, Sbeitla, Om El Goul, and As Siouda. The pipeline was connected to the Tunisian-Algerian gas pipeline in the Charaa area on June 1, 2026. Gas supply is expected to be gradually extended from Hajeb El Ayoun to Sidi Bouzid, with the second phase scheduled to be completed within two months. The project’s cost is approximately 40 million dinars, and its goal is to supply the city with natural gas and improve transportation and distribution services.
Notice: This Is an AI-Generated Summary
Comments (0)