Ready to play
Ready to play
The Middle Line Stormwater Drainage Project in Sharjah is currently 70% complete. Its goal is to improve drainage efficiency and reduce water pooling in key areas within the emirate. The project includes extending main pumping lines, establishing two primary pumping stations, and constructing shoreline outlets to drain water into the sea and optimally utilize existing networks. This project is a strategic investment valued at 500 million AED, contributing to addressing water pooling challenges, reducing congestion, and enhancing infrastructure sustainability. It is expected to be completed in the first half of 2027.
Notice: This Is an AI-Generated Summary
Comments (0)