الجزيرة نت
الجزيرة نت
Ready to play
Ready to play
Satellite images have revealed the completion of a floating combat bridge in Deir ez-Zor, Syria. It was constructed by the Ministry of Defense in collaboration with Turkey, with the goal of reconnecting the banks of the Euphrates River and facilitating civilian movement after the fixed bridges in the area were rendered inoperable. The bridge is approximately 230 meters long and is located near the political bridge, in an effort to alleviate the suffering of residents and provide a temporary land passage until the completion of the political bridge, which is expected to be finished in 2027. The bridge is considered an important step toward restoring transportation in the province, which has experienced connectivity disruptions for some time.
Notice: This Is an AI-Generated Summary
Comments (0)