الشرق الأوسط
الشرق الأوسط
Ready to play
Ready to play
The flow of water from Alouk Station in Hasakah has returned to normal after more than 7 years of interruption. The maintenance and rehabilitation work, which took nine months and was carried out in cooperation with the Water Corporation and the Red Cross, have been completed. This process culminated in a trial phase of water pumping. Full operation is expected to commence after completing technical tests, which will provide more than a million people with a steady supply of clean drinking water. This marks the end of a long period of water shortages and deteriorating health conditions caused by water deprivation. Alouk Station is the main water source in the region and has faced numerous obstacles due to military operations and incursions. However, resuming its operation aims to end the water crisis and improve the health conditions of the population.
Notice: This Is an AI-Generated Summary
Comments (0)