Ready to play
Ready to play
Egypt is preparing to increase its natural gas production by approximately 80 million cubic feet per day from a field in the Mediterranean Sea, through the reactivation of the "Fium North-4" well after implementing a new sidetrack. The goal is to reduce reliance on imports and enhance energy security. This step is part of the efforts by the Ministry and British Petroleum (BP) to improve local production and reduce costs by utilizing existing infrastructure. Technical teams successfully reached the targeted formations at depths exceeding 3,000 meters, adhering strictly to safety and efficiency standards.
Notice: This Is an AI-Generated Summary
Comments (0)