59 Days
Source:
عدن تايم
عدن تايم
Ready to play
Ready to play
A technical study is underway to assess the structural condition of the highway extending from Aden area to Al-Suqayya in Lahj. The goal is to develop a maintenance and rehabilitation plan that includes addressing potholes, rehabilitating damaged sections, and paving an area of up to 135,000 square meters. This initiative is part of the Ministry of Public Works and Roads' efforts to enhance road infrastructure, improve efficiency, and support traffic safety. It is considered one of the vital projects connecting the governorates in the region.
Notice: This Is an AI-Generated Summary
Comments (0)