المشهد العربي
المشهد العربي
Ready to play
Ready to play
The Egyptian Ministry of Transport, in cooperation with the General Authority for Roads and Bridges, is preparing to launch the second phase of the Bus Rapid Transit (BRT) project on the Greater Cairo ring road. The phase extends over a length of 40 kilometers and includes 16 main stations, beginning at the Mashir Tantawi station and ending at "Sun Capital" near the Faiyum Road intersection. The project aims to improve sustainable public transportation, reduce traffic congestion, and connect densely populated areas such as New Cairo, Maadi, and Mokattam. Additionally, it seeks to enhance connectivity with main roads to improve the efficiency of the transportation network and reduce travel times.
Notice: This Is an AI-Generated Summary
Comments (0)