18 Hrs
Source:
المشهد العربي
المشهد العربي
Ready to play
Ready to play
Hungary is facing a severe economic crisis as a result of the drought wave in 2026, with losses exceeding 500 billion forints ($1.6 billion), surpassing the damages incurred in 2022. The electricity generation sector has also been impacted due to a partial shutdown of the "Paks" nuclear power plant. It is expected to take up to a month to restore its full capacity if the low water levels in the Danube River persist, which threatens the country's energy supply security.
Notice: This Is an AI-Generated Summary
Comments (0)