17 Hrs
Source:
المشهد العربي
المشهد العربي
Ready to play
Ready to play
The Libyan Steel and Iron Company in Misrata has halted its production due to a power shortage, following an order from Libyan Prime Minister Abdul Hamid Dbeibah to connect its power generation plant to the national electricity grid. This measure aims to maintain continuous production amid the energy crisis. The company is one of the few non-energy sector companies in Libya that exports its products, and it is currently facing an electricity crisis that has led to its suspension of operations.
Notice: This Is an AI-Generated Summary
Comments (0)