Ready to play
Ready to play
The Secretary-General of the Sana'a Local Council inspected the project for constructing stormwater drainage and the sewage network on Gaza Street, which has been fully prepared after completing the engineering and construction works with local funding. He praised the efforts of the engineering teams in completing the project according to specifications and within the designated timelines. He emphasized that the goal is to improve infrastructure and enhance the efficiency of water and sewage services to reduce the damages caused by floods and water accumulation in the area.
Notice: This Is an AI-Generated Summary
Comments (0)