4 Hrs
Source:
المشهد العربي
المشهد العربي
Ready to play
Ready to play
The Egyptian Minister of Electricity and Renewable Energy announced that the electric linkage project with Saudi Arabia has been fully completed on the infrastructure side, with some final work and testing still ongoing in Saudi territory. The project aims to achieve grid integration between the two countries through an overhead line spanning 1,300 kilometers, consisting of 450 kilometers within Egypt and 830 kilometers in Saudi Arabia, along with a 20-kilometer submarine cable beneath the Gulf of Aqaba. This connection strengthens electrical cooperation between Egypt and Saudi Arabia and supports sustainability and shared energy goals.
Notice: This Is an AI-Generated Summary
Comments (0)