Ready to play
Ready to play
The Tamadun Water Project in the Al-Nadra District of Ibb Governorate has been handed over to the community committee after the completion of construction and preparatory work. Funded by the Kuwaiti-based Direct Aid Society, the project cost $150,000. It includes a sedimentation tank with a capacity of 150 cubic meters, an integrated solar energy system, a pumping line, and part of the distribution network, all aimed at providing a stable and sustainable water supply to residents. The project seeks to enhance the area's water infrastructure and ensure continuous service by utilizing solar energy to reduce operating costs.
Notice: This Is an AI-Generated Summary
Comments (0)