1 Day
المصدر:
لبنان ٢٤
لبنان ٢٤
جاهز للتشغيل
جاهز للتشغيل
The main water line "66" in Nabatieh has been repaired through joint efforts between the municipality and Électricité du Liban, with support from Deputy Hani Qobeisi and the Lebanese Army Intelligence Directorate. Water supply to the neighborhoods will be gradually restored, after being halted due to damages to the network, in an effort to return to pre-war conditions and provide vital institutions and citizens with a regular water supply.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading