1 Day
المصدر:
أخبار الصين
أخبار الصين
جاهز للتشغيل
جاهز للتشغيل
Wind turbines have been installed at an elevation of 5,350 meters above sea level in the Shiteng area in southwestern China. The installation was completed on June 18, 2026, after transporting the turbine components through mountainous regions. This marks an important step in enhancing renewable energy sources in the region.
تنويه: هذا ملخص تم إنشاؤه بواسطة الذكاء الاصطناعي
comments.heading