39 Days
Source:
النهار أونلاين
النهار أونلاين
Ready to play
Ready to play
The eastern states of Algeria experienced a partial power outage due to a technical fault at an electrical facility in Sidi Aouakeb, Biskra. The Ministry of Energy confirmed that technicians are working to restore electricity gradually, and the situation is considered exceptional rather than a crisis, with power expected to be fully restored within an hour. The fault has been fully repaired, and efforts are currently underway to restore electricity to the affected areas.
Notice: This Is an AI-Generated Summary
Comments (0)