AL24 News
AL24 News
Ready to play
Ready to play
The Minister of Energy and Renewable Energies, Murad Agal, confirmed that the malfunction that affected the electrical plant in Sidi Abdelkader, Biskra, was caused by the high heatwave impacting several states. He stated that the fault was exceptional but has been controlled. The Prime Minister, Siwi Gharib, accompanied the minister during their visit to the control center of the national electricity grid system in Algiers to monitor the process of restoring the network after the technical failure. He pointed out that electricity consumption in Algeria has increased significantly, with recent days recording record figures of 21,370 megawatts in demand. The government has made substantial investments to ensure a continuous electricity supply across all regions.
Notice: This Is an AI-Generated Summary
Comments (0)