12 Days
Source:
النهار أونلاين
النهار أونلاين
Ready to play
Ready to play
The civil protection units in Setif province managed to control a fire that broke out inside a plastic materials warehouse in the industrial zone. The operation lasted three hours and involved 80 personnel, 12 fire trucks, and specialists in chemical hazards. The fire resulted in one worker being injured and transported to the hospital. Despite harsh weather conditions, the safety of the structures nearby was maintained. The ongoing efforts focus on cooling and surveillance, and the situation remains under control.
Notice: This Is an AI-Generated Summary
Comments (0)